Hello,
For statistical reason, our statistical forecast is made with monthly time bucket (Gregorian calendar). The business requirement is to have converted the results in fiscal period month. After conversion based on the DP logic we are loosing 5-7 % from our accuracy.
How we can fix that difference?
Any idea would be appreciated.
Thanks, Marius