The Projected Issue Date is in the report and also is the Job Number. However, since the report is grouping from the "start date" all CR wants to count is the Job Number for that Start Date. I need CR to count the Job Number that was due on the Projected Issue Date.
For instance on 8/24 there were 6 jobs planned. Only 5 of those jobs were completed on that day. The grouping for the start day is showing 5 (which is correct) but i need a formula or something to tell me that 6 jobs were planned.