Hi All,
Please help me fix following error
I want to transfer planning data from SOP to COPA. When I do transfer, I got message :
Characteristic value 1000 6200 does not exist for characteristic PRCTR (Profit Center)
The characteristic "PRCTR" ("Profit Center") should be posted to Profitability Analysis (CO-PA). When the system checked the entries, it was established that the transferred characteristic value (" 1000 6200") is not valid in CO-PA.
I knew 1000 is Controlling Area and 6200 is Profit Center. But I do not know why system post 2 value to one Profit Center characteristic
I planned planning data in S991 (Plant, SOrg, DC, SOff, Material and Customer). I checked with SE16n and I saw my data
I maintained following steps :
- COPA Profile, MC7P
S991 version A00 , COPA Version 0. Record Type F, Plan indicator 1
- Characteristic assignment
+ S991-WERKS --> COPA - WERKS
+ S991-VKORG --> COPA - VKORG
+ S991-VTWEG --> COPA - VTWEG
+ S991-VKBUR --> COPA - KMVKBU
+ S991-MATNR --> COPA - ARTNR
+ S991-PKUNAG --> COPA-KNDNR
- Key figure Assignment
+ S991-FKIMG --> COPA-ABSMG
- Key for planning Activity
Assign COPA Profile to Assignment. and Plan indicator = 1
Thanks.