Re: Workflow is going to queue after releasing the PR manually

$
0
0

Hello,

 

It makes sense to activate the event queue for the PR release. If the PR release happens in mass via batch program  then system load caused by a large number of triggered events  can be spread over a longer time period using event queue administration. This counters the  threat of system overload.

 

You would have maintained the check box "Enable event queue" in SWE2 2 against the BOR object and event.

 

These events will be set in queue based on the timelines mentioned in SWEQADM . Batch job SWEQSRV is scheduled to deliver the events. If you need the events to be delivered quite frequently then you can change the timings of this batch job.

 

Regards

Sandy