Dear Sammar,
i have change my scenary in Top dowm logic, but the result is the same.
The next WBS element is not update to start basic date to 13.7.2015 .
When i run scheduling the system create the following pop-up (if could be useful for us)
I make some error in scheduling activity or maybe a customizing problem?
I don't know why the system not consider the actual date of previous WBS
Thanks a lot
Daniele