- The interesting fact is, you do not move all the lots to LIMS. For example if in SAP after GR 10 lots are generated then you are transferring say 7 inspection lots to LIMS. Am I right? - No we are transfering all the lots to LIMS which are generated against GRN.
- You record the results against these 7 in LIMS and expect the results should be updated in all the 10 inspection lots in SAP?? - Currently they are entering result againt one lot only out of that 10 and authorize the same and release.(for example 10 lots against one GRN). expecting RR copy to another 9 lots.
Thanks,
Abhishek