Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8581

I cannot import Excel Import Extension along with Requriement model or conceptual data model

$
0
0

Hello

 

I have attached Excel import Extension along with Requirement model and successfully imported the data from excel but Powerdesigner gets stuck for hours when ever I try to checkin the Excel Import Extension along with the model into the repository. I tried to uncheck the Excel Import Extension during the checkin process and tried to check in and the model checks in fine into the repository. I tried the same with conceptual and logical model and the same problem persist. It differs with the physical model though, when I created a new physical model and attached the Excel import extension, the model again checks in fine.

 

Does anyone know why this scenario is happening? and why it is only particular to certain type of models?


Viewing all articles
Browse latest Browse all 8581

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>