Hi Wawan,
I need it not during billing.
But during create contract with reference to the billing.
Although the billing has the WBS in the PA Segment, but in the newly created contract with reference did not have the WBS in PA Segment.
On a side note, for billing creation I have to code an exit in CMOD to populate the PA Segment during billing.
Thanks