Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8581

Re: ABOUT AVAILABLE CHECK

$
0
0

Hi Michael

 

We have the following parameter to carry out availability check in sales order.

 

1- Plant has to be assigned to item level.

2- Requirement type should be assigned to requirement class.

3- Requirement class should be switched on for availability check.

4- Checking group should be assigned in material master.

5- Schedule line category should be switched on availability check.

 

Please check the above settings and do let me know.

Please focus specifically on Requirement type and class settings.

 

Regards

Neeraj


Viewing all articles
Browse latest Browse all 8581

Trending Articles