Hello,
If you cancel the production order confirmation through CO13 it will rest the standard order status not the user status automatically in standard SAP.
-----> Is any other method to have effective control over the wrok flow of GM & CNF for a production order.
BCRQ Order to be handled in batches
If order items to be handled in batches status I0369 BCRQ is set in the order.
------> I don't want my order item to be handled in batches. What should i do.
I checked MM3, OPJH, OPL8 w.r.t Batch Management, nothing is active, then what made the system to behave like this, for this Production Order Alone.
Best Regards,
Dinesh V.