Hello SD gurus, Would you please help me to resolve this issue?
I followed and configured all the required steps for product allocation in ECC 6.0 Version still the product allocation is not working as expected.
Here are the steps performed
1. Created procedure through OV1Z
Maintained Product allocation procedure
- T.code OV1Z
- 2. Maintain product allocation object
Transaction code: OV2Z
- 3. Create required info structure as per requirement
- T.code MC21
- 4. Specify Hierarchy and Define the “Product allocation planning structure”
Transaction code: OV3Z
- 5.Define Consumption periods
- 6. Control product allocation
- T. code: OV4Z
Selected the product allocation procedure and given the required
criteria and assigned to Info. Structure S991.
Activated ‘Requirement category’ for product allocation
- 8. T.code OVZ0
Activate schedule line category for product allocation
S991 Info structure Planning parameters updated
Mc7F
Create update
- T.code MC24
Activate the update
- T.code OMO1
Create planning Hierarchy
- T.code: MC61/62
Maintain planning type
- T.Code: MC8A/B
Create the product allocation plan for required quantity
MC94
IN spite
of reserving stock as shown against the product allocation
material specific and customer specific product allocation is not
worked and it allocated stock to sold to party 136
Available stock is 200 EA in plant 1101 with the particular batch
the stock is 100 ea
Discussion locked. Reason: Duplicate post - Product allocation is not working after setting all required config!
Message was edited by: Jyoti Prakash