User exit for MRBR Release
Hi Experts MRBR can release automatically if the GR already completed agains the invoiceSAP standard its will release automatic once GR is match with total IV. I have a requirement to release the old...
View ArticleRe: Duplicate Invoices Report
Hi, There is a standard report from FI module, "S_ALR_87012341" - Invoice Numbers Allocated Twice You can also check the duplicate items from BSIP table. You can refer to the below link which shows...
View ArticleRe: Retail site assigned with multiple distribution chain
Hi Caroline, To the best of knowledge, Site will be treated as Customer in Inbound and Sales area distinction is used for Customers and not for articles. There is no way we can identify the sales area...
View ArticleRe: Comuletive actual activity type price
Hi Dan,Yes it's possible.You need to use CO Delta Version. Pilot note 1511164 - AVR using prices from ABC delta versiondescribes the config: 1. Create the ABC delta version: a) General Version...
View ArticleRe: Can I learn SAP HANA and choose as a career option?
Hi, http://scn.sap.com/thread/3337143
View ArticleRe: Querry of BOM copy from one system to another
Hi Raj, You can try export-import or download-upload method to copy the query. Go to transaction SQ02 and press the "Transports" button (truck icon). In the "Transport Action Selection" choose...
View ArticleCosting Run_CK11N error for FG which include No Valuated Material
Dear Experts We are receiving OLD Cylinder from Customer to Repair. Through MIGO this material received as non valuated material in the stock. In PP we are creating FG - Repaired Material by using non...
View ArticleAction execution for Line Items
Hi folks,Is there a way to trigger action based on Line Item ID? Let's say once Item1 status becomes Completed.I can obviously put the logic into Action method itself but the goal here is to have it as...
View ArticleRe: LSMW - Create MM Contract
Hi AnnaCan you update whether your attempt was successfullIf i have multiple services( linked to service master) underneath each line item . Can this program support that ? Thanks in advance for any...
View ArticleRe: Can COHV be run with no sequence
Hi Jez, It is standard SAP behavior. If no sorting rule is defined in the layout, it will by default display the data based on the keys. You will need ABAP code to modify this. Regards,Julian
View ArticleRe: GATP RBA not checking Allocation
Hello MT APO, Looking at the example that you had provided, I could guess that you have the following settings in check instructions 1) Product Allocation check - 1st Check2) Product Availability Check...
View ArticleRe: Connecting NW 7.3 to ECC 6.0 ides
Hey Rishi,I think I am able to connect to the system, but the still the connection is not completely done.Here are the screenshots, thanks Rishi.
View ArticleRe: Show source data in comments feature
One more question on base member. Jan 2014 cell(E4) has 6.67 value(above scenario only),which was derived from epmformatting sheet formula - dividing parent' (2014.Q1) value divided by 3. Now i want...
View ArticleRe: Reason Code Issue in f-28
Hi Ravi, Thanks for immediate response please find below screen shots. RegardsDiwa
View ArticleRe: Customize SPRO - Create documentation for a Structure Node
Hi Pawan, I've done it but it doesn't work.I've already created a new document in SE61 but there is no way to add it to the structure node in SIMGH (the button to do it is still disabled). Thanks,Tere.
View ArticleRe: New Line in Message- With Popup to confirm
If you will execute this FM then you will see ok and cancel button at the end try and execute it
View ArticleRe: Current month variable in ScriptLogic
1. We are in the NetWeaver forum2. Author understands what he want!3. The term "month he is currently working" is meaningless
View ArticleRe: Sloc needs to be excluded from MRP and backflush should happen from...
Hi Sireesha, If you are using stock determination group and system picks the material from that storage location, backflush will also have from the same storage location. My question is why to...
View ArticleRe: Customize notifications: Subscriptions and Mailboxes
Hi Jochen, The requirements you have mentioned in your query can be taken care of at Design-time itself. Lets see them one by one: This can be handled at design time. Go to the properties of the task...
View ArticleRe: Receipt from Production upload with DTW
Hi Luliana,Did you check the solution?Please close the thread if it is answered.
View Article