Hello Abhijeet,
Any time a request or initial load is run, a corresponding R3AD* STOP entry is added to the ERP outbound queue so that no delta loata load queues can be processed until it has finished. This is correct behaviour and is required to ensure data consistency. Since the queue contains no data you can safely delete it.
Thanks a lot.
Best regards,
Julin